PLM Group (PLM)

background information

  • 2008 network reconfiguration
  • 2008 2nd level desktop support

PLM facts

  • 150+ Windows Desktops
  • 40+ Macintosh Systems
  • Complex Back-Office Infrastructure
    • Windows 2003 Servers with Exchange
    • Extreme switches
    • Radware load balancers
    • IBM Blade servers
    • IBM fiber channel RAID

Loop core responsibilities at PLM

  • Map and document network infrastructure
    • Design and implement a new network addressing scheme that would support PCI compliance
    • Migrate users to smaller Exchange mailboxes
    • Merge two separate Windows Domains into a single domain.
    • Establish Active Directory enabled single point logon for Apple computers
  • Supply 2nd level help desk support

contract highlights

  • Upgraded Extreme network switches to current firmware
  • Migrated all desktops & servers to new subnets & VLANs
  • Performed a global naming convention change
  • Changes were transparent to network users